Foundations
USA
Four Bears Bridge
Due to the geological conditions, steel tube piles of up to 51 meters in length had to be driven into the lake bed at an angle of 12 degrees in the course of the foundation work.
France
Waste Incineration and Recycling Plant Isséane
Bilfinger Berger constructed a waste incineration and recycling plant for 22 local communities in the Ile-de-France region and three arrondissements of the French capital.
Germany
Europa Passage Hamburg
To build this complex,an enormous construction pit with a depth of up to 24 meters had to be excavated, and because of the high groundwater level it was enclosed with an 80-centimeter-thick diaphragm wall.
Germany
Reichstag Berlin
For work in the groundwater, Bilfinger Berger used a special technology: underground demolition by means of bore holes.